willbones
A couple of days ago I put down a grano screed to level out kitchen floor. The screed is about 15 mm thinest and about 40 mm thickest. It has a DPM underneath it. The screed is compressivley very hard but it quite crumbly. I'm going to put SLC over the entire surface before I tile it. Question is whats the minimum time i can leave it before i put SLC down and tile? The screed was made from 8 bags of grano, 4 sharp sand, 2 cement with only a little bit of water to get it to go off. Some reckon that this is nowhere near enough cement but got the instructions of a very reputable builder.
Will
Will