S
Skid Solo
Hi,
I have a problem with the grout in a ensuite shower.
The shower has not been used for a while (couple of months) as the whole heating hot water system has recently been replaced. Now that we are re-using the shower the grout between the tiles has started ‘popping’ out i.e. when we have a shower we find lengths of grout (around 2” long) sitting in the bottom of he shower tray and I can see where the grout has come out from between the tiles on one wall.
During the recent installation there was a leak from a pipe in the loft (existing joint was not up to main’s pressure) which was fixed however the wall behind these tiles (cavity plasterboard) got wet and the wallpaper on the other side has blistered in places.
The whole ensuite is to be replaced in a coupe of years (just cant afford at the moment having just had whole new heating and hot water system) and I quite expect to have to replace the plasterboard during this exercise prior to re-tiling, however I don’t want water from the shower going elsewhere in the house until this refurbishment is complete
Can you therefore suggest an interim fix to last a coupe of years ? my thoughts were :
Obviously open to other solutions, would Silicon be better than grout as a repair?
Your thoughts appreciated
Thanks
I have a problem with the grout in a ensuite shower.
The shower has not been used for a while (couple of months) as the whole heating hot water system has recently been replaced. Now that we are re-using the shower the grout between the tiles has started ‘popping’ out i.e. when we have a shower we find lengths of grout (around 2” long) sitting in the bottom of he shower tray and I can see where the grout has come out from between the tiles on one wall.
During the recent installation there was a leak from a pipe in the loft (existing joint was not up to main’s pressure) which was fixed however the wall behind these tiles (cavity plasterboard) got wet and the wallpaper on the other side has blistered in places.
The whole ensuite is to be replaced in a coupe of years (just cant afford at the moment having just had whole new heating and hot water system) and I quite expect to have to replace the plasterboard during this exercise prior to re-tiling, however I don’t want water from the shower going elsewhere in the house until this refurbishment is complete
Can you therefore suggest an interim fix to last a coupe of years ? my thoughts were :
- Just re-grout where the grout has come out (not sure this will help that much and may be an ongoing activity until I refurbish)
- Scrape out old grout and replace with new (lot more work and should I give the wall behind some time to dry ? should I remove a tile to see what is actually going on behind ?)
Obviously open to other solutions, would Silicon be better than grout as a repair?