S
SandyFloor
Hi, I'm looking for ideas or opinions. Have recently started a 400sq. mtr job of sandstone 22mm thick with a rough quarry finish (more like slabs). Sealing, cutting and fixing no problem. The problem is with the varying gaps and the depth grouting is taking an age and using up a lot of material. So far we've been using grouting bags and cleaning off with a washboy (tiles previously sealed).
Does anyone have any ideas to save time or material?
Possibly it's just a case of accepting more grout is reqd than expected and giving the job to whoever gives me lip that morning.
Regards,
Sandy
Does anyone have any ideas to save time or material?
Possibly it's just a case of accepting more grout is reqd than expected and giving the job to whoever gives me lip that morning.
Regards,
Sandy