P
Protilers
Evening all.......
went to my job in Notting hill today.....total disaster!!!!..........hheheheheheheee
the architect decided that my "mat well" was too large.......I always make them the size of the swing of the door..........(open the door fully and make a mark!).......I thought this was standard.....
the only time this has been different is if the mat well needs to be bigger!!!!!!!.......like in an office block and there is loads of footfall.....what with snow and all!............
I told the architect we could be opening a can of worms.........he said it will "look" better!....
anyway....I had to break out some cuts:
now the door needs to be trimmed to accommodate the tiles plus a wetherbar can not be fitted to the door and that means the outside step has to be raised by 20mm...........
one course of tiles to look better and about £2000 worth of labour and materials to correct all the errors brought about by adding a single row of tile!!!!
hehhehehehhehheheeee........
then they filled the drains up to "test" the system (put to much water in the drains!) and flooded the downstairs toilet......water was pouring in from the soil stack and the 1"1/4 basin waste pipe!!!....hehehheheheeheehhee...
tomorrow is another day!!!!!
hehehehehehe
Lee
went to my job in Notting hill today.....total disaster!!!!..........hheheheheheheee
the architect decided that my "mat well" was too large.......I always make them the size of the swing of the door..........(open the door fully and make a mark!).......I thought this was standard.....
the only time this has been different is if the mat well needs to be bigger!!!!!!!.......like in an office block and there is loads of footfall.....what with snow and all!............
I told the architect we could be opening a can of worms.........he said it will "look" better!....
anyway....I had to break out some cuts:
now the door needs to be trimmed to accommodate the tiles plus a wetherbar can not be fitted to the door and that means the outside step has to be raised by 20mm...........
one course of tiles to look better and about £2000 worth of labour and materials to correct all the errors brought about by adding a single row of tile!!!!
hehhehehehhehheheeee........
then they filled the drains up to "test" the system (put to much water in the drains!) and flooded the downstairs toilet......water was pouring in from the soil stack and the 1"1/4 basin waste pipe!!!....hehehheheheeheehhee...
tomorrow is another day!!!!!
hehehehehehe
Lee