I have just measured 160 yrds off floor .The screed was 4-6 inches in places in depth and was power floated in.the screed is only 4 weeks old.Now i know the recommended drying times and the proper way to prepare this floor.But despite my advice the customer is still wanting me to proceed with the tiling now.I was going to walk away from this job but the customer has came back to me and said if i draw up a disclaimer saying i have advised them that the floor is not ready to be tiled on they will sign it.Does this cover me ,do disclaimers mean anything or will it still come back to me.I have spoke to reps in northern ireland to see if they hav any products they would stand over in this case that i could use but they will not stand over any of their products if the screed is not fully cured.Any advice welcomed