P
paul creighton
Hi, everyone
I'm new to this site and if possible would like some help and advice from you all. I've a large tiling job to price up in an open plan kitchen/dining room, living area approx. 56 sq. metres (7m x 8m). The dining area has wet under floor heating and is covered by concrete (4m x 7m). Then at the same level it runs into the kitchen area which also has wet under floor heating (suspended floor) with 1” plywood on top, it has been screwed down onto the joists which are 400mm apart. I am concerned that the plywood has not been screwed down every 4”; the customer wants expensive Jerusalem marble tiles lying on top. I am concerned about the 2 different floor types wood to concrete. What should I do? Any help and advice would be welcome. Thank you.
I'm new to this site and if possible would like some help and advice from you all. I've a large tiling job to price up in an open plan kitchen/dining room, living area approx. 56 sq. metres (7m x 8m). The dining area has wet under floor heating and is covered by concrete (4m x 7m). Then at the same level it runs into the kitchen area which also has wet under floor heating (suspended floor) with 1” plywood on top, it has been screwed down onto the joists which are 400mm apart. I am concerned that the plywood has not been screwed down every 4”; the customer wants expensive Jerusalem marble tiles lying on top. I am concerned about the 2 different floor types wood to concrete. What should I do? Any help and advice would be welcome. Thank you.