Yes thanks for the heads -up. I have a fair amount of prep work to do first, not least removing all the old flaking paint, grinding down some high spots - see my other post for that one and also I will be needing to get some outdoors SLC for some 20mm lower spots.I would rather square the slope up before tiling, the top of the slope is already cracked!