R
radi
Hi Folks
I am currently doing a tile repair to a shower cabinet mentioned in a previous thread.I have replaced the tiles on the plasterboard wall and given the adhesive 24 hours to set.
The question is how long roughly should you wait to apply sealant/mastic after you have applied the grout?
I am using BAL Superflex and the only instructions that I can see in relation to time are:
1. Allow 15 mins for grout to dry before cleaning the tile surface
2. Wait 24 hours before subjecting tiles to normal service conditions.
I am currently doing a tile repair to a shower cabinet mentioned in a previous thread.I have replaced the tiles on the plasterboard wall and given the adhesive 24 hours to set.
The question is how long roughly should you wait to apply sealant/mastic after you have applied the grout?
I am using BAL Superflex and the only instructions that I can see in relation to time are:
1. Allow 15 mins for grout to dry before cleaning the tile surface
2. Wait 24 hours before subjecting tiles to normal service conditions.