How long should this take

I think to be fair it depends alot on tile size, state of the walls and floor, if you have a helper, tanking etc etc. Ive done a full bathroom in a day, 25m2, walls and floors (not grouted) and done a smaller one in near 5 days. Just depends on the job.

I would still book a working week for a bathroom but aim to lay the odd floor or a splashback somewhere!
 
Last edited by a moderator:
for me an average bathroom can be any where from two day up to two and half but as we have all said it can depend on all sorts of things,walls, cuts, fixtures and fittings tiles adhesive, helpers and all the other bits that can affect your speed ect.
 
As others have said deends on size state of walls windows.......... your average 17mt bathroom with normal ceramic good walls normally 2 days start to finish
 
Are you guys including taking off the old tiles and making good, or do you mean on a perfect surface, ready to go (I hope so)..............?
 
it was a new build walls all good,will be back to house monday next to do kitchen floor & main bathroom,will take some pics then
 
quick for me too, does depend a lot on state of walls, how many fittings to drill wastes for, how many nibs,size of tiles etc, quality above quantity in my book tho'
 

Advertisement

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.2%
  • Kerakoll

    Votes: 17 9.9%
  • Ardex

    Votes: 12 7.0%
  • Mapei

    Votes: 49 28.5%
  • Ultra Tile

    Votes: 21 12.2%
  • BAL

    Votes: 40 23.3%
  • Wedi

    Votes: 4 2.3%
  • Benfer

    Votes: 5 2.9%
  • Tilemaster

    Votes: 24 14.0%
  • Weber

    Votes: 19 11.0%
  • Other (any other brand not listed)

    Votes: 17 9.9%
  • Nicobond

    Votes: 8 4.7%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 2.9%
Back
Top

Click Here to Register for Free / Remove Ad