I have a job coming up next year and there are a couple of RSJ's that are 7.5m long and 240mm wide.
The distance from the top of the joist to the top of the beam is 22mm, so the plan is to cover the floor with 25mm ply, 6mm Hardi and then tile.
At the moment I'm unsure how to bridge this gap, I can't find any transition that wide to cover the RSJ.
Does anyone have any ideas as to how we can get round this problem.
Cheers