nhendersontile
hi, i hope someone can help. i have an existing recessed shower area where we have taken down tiles etc and fitted new shower traty. however one wall (on the right as looking at pic) is totally uneven. i started levelling with bonding but then read that its not a good idea if going to tile after. i cant board as its too uneven and the walls (crumbly breeze block) wont hold screws well. am i ok to fit a bead at front edge (thinking of using one of those rendering larger ones) and levelling off with wickes one coat patching plaster. then leave for couple of weeks before tiling? also do i fit beading with the plaster or use plsater adhesive?
ive plastered a few times before so comfortable doing it but just want to know its the correct thing. also the gap i am filling out is about 20mm and the tiles are the ceramic 60x 30 ones)
any help much appreciatedx and ave added (pic here hi,
any help much appreciatedx and ave added pic here - flyingkiwi.com/contact-fo...1651%20(1).jpg
thanks
nei
l
ive plastered a few times before so comfortable doing it but just want to know its the correct thing. also the gap i am filling out is about 20mm and the tiles are the ceramic 60x 30 ones)
any help much appreciatedx and ave added (pic here hi,
any help much appreciatedx and ave added pic here - flyingkiwi.com/contact-fo...1651%20(1).jpg
thanks
nei
l