L
lendini
Hi all .firstly this site is the best.After doing my course in swindon i am now slowly taking the steps to moving into a career in tiling after now setting up the business.I have a couple of questions
(1) I have my first job to quote which is going to be a bathroom job.the tiles which the customer has are 75mm ceramic tiles.Now i have to tile the entire bathroom wall and only half way up on the other 3.the question is as these tiles are smaller than the ones i used on my course (150x150mm)i am therefore going to be longer in labour per square mtr as trhere are more to fit.In this case will my sqr mtr price go up or would i start to look at my day rate charge + materials
(2) the ex boyfriend has chiselled the old tiles off and left the walls in a bit of mess.what is deemed as untilable or what can you get away with with methods explained
thanks so much in advance.
(1) I have my first job to quote which is going to be a bathroom job.the tiles which the customer has are 75mm ceramic tiles.Now i have to tile the entire bathroom wall and only half way up on the other 3.the question is as these tiles are smaller than the ones i used on my course (150x150mm)i am therefore going to be longer in labour per square mtr as trhere are more to fit.In this case will my sqr mtr price go up or would i start to look at my day rate charge + materials
(2) the ex boyfriend has chiselled the old tiles off and left the walls in a bit of mess.what is deemed as untilable or what can you get away with with methods explained
thanks so much in advance.