Hi all
just looking for some advice on a potential first job. The job is a small upstairs bathroom. The customer would like 2 walls tiled. The customer will be putting the bath in before tiling which obviously isn’t shown in the picture.
The walls need some prepping as the plaster is starting to flake off in patches and still old adhesive on the wall. Do you think it would be best to take the whole wall down to what seems to be the bottom layer?
my thought process is prep the walls back to solid plaster or render. Tank the walls where the bath will be then continue to tile as normal.
any advice would greatly appreciated. Thanks Dan.
just looking for some advice on a potential first job. The job is a small upstairs bathroom. The customer would like 2 walls tiled. The customer will be putting the bath in before tiling which obviously isn’t shown in the picture.
The walls need some prepping as the plaster is starting to flake off in patches and still old adhesive on the wall. Do you think it would be best to take the whole wall down to what seems to be the bottom layer?
my thought process is prep the walls back to solid plaster or render. Tank the walls where the bath will be then continue to tile as normal.
any advice would greatly appreciated. Thanks Dan.