Impey Water Guard System

Tilers Forums Official Sponsors

Hi,
I am a keen DIYer and have chosen an Impey Aqua Dec 4 and waterguard tanking kit. The Aqua dec 4 is 1.6x0.9m in size so was as real challenge to get level and properly supported into a concrete bathroom floor. The Dec is completely solid with absolutely no movement anywhere on its surface and the water runaway works a treat. So far so good.

I recently applied tthe BAL prime APD primer to the walls and floor. The walls have a new coat of multi-finish. I have both a floor and wall tanking kit so you get two 500ml containers of primer which I don't think is enough by about half if you apply two coats as per instruction. I left this to dry for over a day and it was dry to the touch.

Today I started to fit the corner pieces and found that they just don't have that much adhesion to either the wall or floor. I did not prime the floor initially as there was not enough of the primer and also since the floor has been levelled with a good quality levelling compound and did not appear to be that porus.

I have since primed the floor which is drying but I just don't think it will make that much difference to the adhesion problem.

My concern is that if the adhesion is this poor, is this going to cause problems when the tile adhesive and tiles have been added on top (being done by a professional timer).

Has anyone else experienced this kind of problem? Anyone any ideas what to do next would be much appreciated.

Regards
FarmerJo
 

Advertisement

Thread Information

Title
Impey Water Guard System
Prefix
N/A
Forum
America Tile Forum / Advice Board
Start date
Last reply date
Replies
0

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
FarmerJo,
Replies
0
Views
1,491

Thread statistics

Created
FarmerJo,
Replies
0
Views
1,491

Weekly Email Digest

Back