:hurray: Hi all
Thanks for welcoming me to the Tilersforum.
I am re-arranging my bathroom to accommodate an L-shaped showerbath and have built a stud wall to hide plumbing.
Following advice given in these forums, I will be using a cement based board on the stud walls but because it is 12mm thick the bath would fit better by being installed first and then tiling after.
Is this acceptable?
Regards, Baz