Got 30m of 1200x1200 rectified porcelanosa 11mm porcelain to lay on 6 month old sanded anhydrite with ufh. Am I right with my method to simply use 2 coats primer, anhyfix adhesive, genesis Gls levellers. Expansion strip where is crosses 2 ufh zones. Am I missing anything except an able labourer to help lift them? Fitted plenty of 1200x600/400/300 before but not 1200 square. Cutting is no problem
Last edited: