Have just been to see a kitchen floor that the woman wants tiles layed in, its 9m2 and is plyed out already. She told me she is wanting cable UFH aswell and what would i charge to lay just the tiles, i said id take £300 including addy,grout,Silicon etc which all in the materials equals £75 so really am only taking £225 for laying the tiles (£25 per m2). However if she wanted me to lay the UFH cable then it would be an aditional £80 as it wouldnt take me a whole day to lay but would take about 4 hours or so by the time ive primed etc but all in 2/3 days work. The long and short is that she reconed that was very expensive and is wanting me to talk it over with her husband!!
Am i asking over the odds or is the world gone nuts and wanting everthing for free:furious3:.????
Am i asking over the odds or is the world gone nuts and wanting everthing for free:furious3:.????