Taken up the old floor and the joists are slightly out of level, probably up to 4mm... This is across the joists, not along their length. Given the 25mm ply is going to be very rigid, do I just put in more noggins to allow me to screw it down firmly" and potentially pull it to the shape of the floor, or should I use the noggins to try and make level, albeit above the joists in some cases?
Thanks in advance for any help
Paul
Taken up the old floor and the joists are slightly out of level, probably up to 4mm... This is across the joists, not along their length. Given the 25mm ply is going to be very rigid, do I just put in more noggins to allow me to screw it down firmly" and potentially pull it to the shape of the floor, or should I use the noggins to try and make level, albeit above the joists in some cases?
Thanks in advance for any help