Lol.....I need to go to speck savers...
Wondering what you lot was on about..
Wondering what you lot was on about..
There's roughly 25mm differents in height from the other floor, the 80m area is already screeded, but the client has already got the concrete boards, self levelling will be to much
What's this SLC?
Your asking what SLC is
if it 25mm difference in height you could rescreed it using ronafix through the mixNot used to the slang these days lol