boisty
Hi Folks
I've recently been asked by a mate to lay some of those bloody 900mm tiles from B&Q (sorry, I'm new on here, is it ok to use the those two letters here? :dizzy2: ) onto his poorly laid 18mm p4 floor which has wet underfloor heating running off the central heating system.
Without wishing to lift the floor entirely could I get away with overlaying the floor with 9mm ply or would it be best to lift the existing floor and relay with 22mm p4/p5 chipboard.
Any advice or other ideas will be gratefully received.