K
kev richy
When Tiling A Floor I Have Been Using The Method Of 2 Tiles On Top Of A Fixed One ;too Mark My Cuts.i Find This Accurate But It Means That The Edge I Have Cut Is In The Main Field Of Tiles.is This Ok Or Am I Doing Something Wrong.iwould Like Too Have The Machine Cut Edge In Main Field.i Can Do This By Measuring But It Seems Slower That Way.how Do You Professionals Do It? Also Is It Correct Too Leave 6mm Gap Around Room?