B
b1gbrad
Looking good Brad.
What is your next plan, tile the walls then the floors???
You're doing a great job there so i (and i reckon the other guys) would say tape the wall floor intersection again and cover in mapegum, then tile the walls. Then tank the remainder of the floor, or better still lay either Ditra matting or Dural C1 on the floor, tape the joints.
These measures will make sure the room is double tanked and the uncoupling membrane will also allow any lateral movement in the floor generated by the underfloor heating.
This will give you a really good quality, bomb proof wetroom.
Thanks for the advice, but it's a little too late! I've already tiled the floor and shower area (I'll post the pics up soon). Most of the shower area will be sectioned off with glass so I think the floor will be mostly protected from water, so hope the marmox, tape, sealent and mapegum I've used on it will be sufficient.