Customer was very specific on this job, Now that im Bathroom installing aswell as tiling i thought i would share this full installation with you. The full lot was to do. The tiles on this job were 1000mm x 355mm tiles, and on the floor black opal gulfstone tiles 400 x 400mm. Job was to include strip all old stuff out of bathroom. Remove soil stack, cap off and fit AAV. board where stack had been, No pipes to be seen or boxing so all pipes routed under floor, replace old floor boards, re route towel rail pipes to accomodate new stainless steel one, Also to install one of my speciality recessed ceilings with led,s in the uprise, Fit new Jacuzzi bath and all new utopia furniture with moulded in sink. Also to replace old fan with icon fan with delayed shutter. Back moulds to be removed and square edge trim used instead.