Hi all.
I am nearly ready to tile my bathroom and would love to hear whether I am going to be doing it properly.
I have searched many times but tbh I have found some conflicting advice opinions which have left me confused ♂️
2 x walls and the floor.
One wall is dot and dab plaster board, and the other is skimmed plaster over a plaster boarded stud wall.
I have tanked both walls as I have plumbed my new bath in.
So, I am applying sbr to both the skimmed wall and plaster boarded dot and dab.
I am using ceramic tiles on the skimmed wall, and either ceramic or porcelain on the dot and dab.
The floor is chip board (new extension) so I intend on using Hardi backer board (6mm) I am going to use adhesive first then screw board down using 25mm screws. Once set I will then tile onto the backer boards.
Does this sound all ok? Few questions:
Do I need to prime the chipboard prior to using adhesive?
I have read a SPF will suffice for the floor. Is this correct as been told I need 2 part?
Can you recommend a decent adhesive for both floor and wall? And a decent grout.
The floor is solid.
I have done a few diy tiling jobs but want to make sure this is done properly.
Thanks all (Plasterer by trade)
I am nearly ready to tile my bathroom and would love to hear whether I am going to be doing it properly.
I have searched many times but tbh I have found some conflicting advice opinions which have left me confused ♂️
2 x walls and the floor.
One wall is dot and dab plaster board, and the other is skimmed plaster over a plaster boarded stud wall.
I have tanked both walls as I have plumbed my new bath in.
So, I am applying sbr to both the skimmed wall and plaster boarded dot and dab.
I am using ceramic tiles on the skimmed wall, and either ceramic or porcelain on the dot and dab.
The floor is chip board (new extension) so I intend on using Hardi backer board (6mm) I am going to use adhesive first then screw board down using 25mm screws. Once set I will then tile onto the backer boards.
Does this sound all ok? Few questions:
Do I need to prime the chipboard prior to using adhesive?
I have read a SPF will suffice for the floor. Is this correct as been told I need 2 part?
Can you recommend a decent adhesive for both floor and wall? And a decent grout.
The floor is solid.
I have done a few diy tiling jobs but want to make sure this is done properly.
Thanks all (Plasterer by trade)