P
paul83finlay
HI I WAS WONDERING IF ANYONE CAN GIVE ME SOME ADVICE ON WHAT TO DO AND LET ME KNOW WHERE I STAND. THE JOB IS A 32SQM KITCHEN FLOOR. THE TILES THAT WHERE ON THE FLOOR HAD ONLY BEEN DOWN 2 YEARS AND ALL WERE LIFTING, SO THE CUSTOMER WANTED THEM TAKING UP AND RETILED. I WAS GOING TO LIFE THE OLD 9MM PLYWOOD BUT WE DECIDED THIS WAS NOT GOING TO BE VERY EASY AS IT WENT ALL THE WAY UNDER THE UNITS. SO WE DECIDED THAT I WOULD PUT SCREWS AT 100MM CENTERS ALL OVER THE FLOOR THEN PRIME IT WITH BAL BOND THEN I LAYED THE GENISIS G-MATTING SYSTEM. CUSTOMER VERY HAPPY WITH THE JOB BUT NOW THEY HAVE PHONE ME TO SAY THAT THE TILES HAVE A CRUNCHING/ CREEKING NOISE WHEN YOU WALK OVER CERTION AREAS. I HAVE BEEN TO HAVE A LOOK, AND THIS IS THE CASE. TO LOOK AT the FLOOR THERE IS NO SIGHT OF GROUT CRACKING OR TILES MOVING BUT WHEN YOU WALK OVER CERTION PARTS OF THE FLOOR YOU CAN HEAR THE CRUNCHING/CREEKING NOISES.
I TILED THE BATHROOM UPSTAIR AND THE ORIGINAL FLOOR THERE WAS A FLOITING FLOOR SO THAT WAS REMOVED AND I PUT DOWN 40MM WEDI TILED BACKER. THINK THE CUSTOMER WAS THINK WHY DID I NOT DO THAT DOWN STAIRS.
HOPE SOMEONE CAN HELP ME OUT ON THIS ONE.
CHEERS
PAUL
I TILED THE BATHROOM UPSTAIR AND THE ORIGINAL FLOOR THERE WAS A FLOITING FLOOR SO THAT WAS REMOVED AND I PUT DOWN 40MM WEDI TILED BACKER. THINK THE CUSTOMER WAS THINK WHY DID I NOT DO THAT DOWN STAIRS.
HOPE SOMEONE CAN HELP ME OUT ON THIS ONE.
CHEERS
PAUL