northerntile
We are about to lay 100m2 floor tiles onto a tarmac semi dry fibre screed. This was laid in December and left to dry for 6 weeks. The heating was then turned on gradually over 3 weeks. Expansion joints were formed in the screed splitting the floor into approx 4 . Expansion joints also across doorways and around periphery. There are just a couple of hairline cracks. Part of floor is to be in porcelain rest in limestone. Have been advised by several tilers that uncoupling membrane is not necessary just expansion joints above joints in screed. Any help would be welcome. Finally how should expansion jointsbe formed?
Thanks in advance
Thanks in advance