I had thought of that but budget is too low for a former now, I'm confident I can get levels correct and decided to screed floor now and use a mcalpine gully
Sure I've posted this before but should help you out, falls made from tappered 2x1 battons, filled inbetween with rapid set then a very thin skim of thickly mixed slc before tiles