I am about to tile our new kitchen floor which has been extended and is concrete. Half of which does not have a damp proof course (the old bit), whereas the new half does.

The floor is in 3 sections; the old original floor is 3x3 metres, the new floor is 3x3 metres and a strip joining the two is 300mm x 3 metres. I'm concerned about damp rising through the old floor and delaminating the floor tiles and the levelling compound which I'm about to lay, also any potential for future movement cracking the grouting and tiles. The floor is relatively level but they are at slightly different heights (variants of 5-10mm).

When I removed some of the steel pipes that were buried in the old floor screed I had to pull up some of the old floor screed which is about 20mm in depth. This leaves me with a hollow in the floor surface which will also need to be filled.

My question is should I?

a) Use a mapei paintable damp proof course that's reinforced and use a floor levelling compound over the top of that with flexible grout and adhesive.

b) Paint the old section with a damp roof course and use a decoupling membrane and pour a thin screed of approximately 30mm (all I have to play with).

c) Go down a different course of action?

I've attached some pictures of the floor to help to explain my scenario

Many Thanks
Ray
 
P

peckers

I would repair your holes in the floor with ardex a46 broken link removed
then I would clean down and prime the area with no damp course and apply a suitable slc which is suitable to go under damp proof membranes this is done to fill any pinholes in the screed and to provide a smooth flat finish for the membrane to adhere to a damproof membrane I would go at least 500mm onto the area which has a membrane. Ardex arditex na is suitable. ARDITEX NA from ARDEX UK
Then i would apply ardex dpm to the area you have put the slc on. ARDEX DPM from ARDEX UK
Then I would apply another coat of ardex arditex na over the dpm and the rest of the floor area.

If you install A Vapour Equalisation membrane like Dural CI and you have to use a slc under it then you would still need a slc which is suitable for damp locations such as the ardex arditex na:thumbsup:
 
Last edited by a moderator:

Reply to One little room. so many issues in the UK Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
2K
    • Like
Renovated the bathroom on my 1970 bungalow last year. Took up the old pink floor tiles with sds...
2
Replies
25
Views
2K
So I may have done an oopsie. We are putting self-levelling compound down over floor where I...
Replies
3
Views
2K
Hi all, I've laid some Arditex NA over the kitchen floor area (not under cabinets. The area is...
Replies
3
Views
2K
Hello all, Hoping that once again I can get some good advice on here, you were invaluable when...
Replies
3
Views
2K

Trending UK Tiling Threads

UK Tiling Forum Popular

Advertisement

Thread Information

Title
One little room. so many issues
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
4

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

  • Kerakoll

  • Ardex

  • Mapei

  • Ultra Tile

  • BAL

  • Wedi

  • Benfer

  • Tilemaster

  • Weber

  • Other (any other brand not listed)

  • Nicobond

  • Norcros


Results are only viewable after voting.

Birthdays

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside. Our UK based online tiling forum has 48,000 members and started out in 2006.

Top