ms.tiles
TF
Hi all My enter button has decided to stop working,please bare with me. Went to look at a job last night, its a hallway floor with parquet flooring under the carpet. Solid floor but if I take it up then there will be a gap between tiles and skirting and door frames plus over floors leading off it. Would it be possible to cover the floor in a leveller, I would probably use Ardetex NA and then tile on top. I told them I would estimate on pulling up, slc then cement boards and then another estimate for tiling on top etc. Just wondered on everybodies thoughts on levelling over the top for a better surface to tile on to. Sorry about the enter button lol Many thanks
Last edited: