Hi
I've been having a nightmare with this. Pulled it up again and cleaned everything for another go tomorrow.
What is the best way of doing this?
I need to bed them up to meet the floor tiles which went on with 10mm notched. Its an awkward size 800 x 950 with a central drain.
Am I best to do a build up with adhesive then do notched on that when its gone off? Cuts with grinder went fine just laying them is a nightmare.
I'm really starting to hate pebbles.
Any tips much appreciated.