4 days in and I don't feel I've made much of a dent in the huge piles of tiles I've got!!
Spent a day sorting out the concrete to get it level - had to hit it quite a bit with SLC (this was suppose to be all sorted!)
All the furniture still in the lounge, set of stairs that I had to take down with joiner (they had to go in lounge), fridge freezer, 2 dogs, kitchen units etc.. all piled in the lounge. Wanted to get all the ditra down on first day but fat chance.
No outside tap so I put one in last night to make my life easier.
Managed to finish hallway off today and get stairs back in - so managed to get more matting down so I can make a start in the lounge tomorrow.
Spent a day sorting out the concrete to get it level - had to hit it quite a bit with SLC (this was suppose to be all sorted!)
All the furniture still in the lounge, set of stairs that I had to take down with joiner (they had to go in lounge), fridge freezer, 2 dogs, kitchen units etc.. all piled in the lounge. Wanted to get all the ditra down on first day but fat chance.
No outside tap so I put one in last night to make my life easier.
Managed to finish hallway off today and get stairs back in - so managed to get more matting down so I can make a start in the lounge tomorrow.