Ive got an 18mm chipboard floor over layed with 18mm ply screwed at 150mm centres. The ply was coated on the back and edges with sbr before installation.
Running a level over the floor some joists are up to 7mm lower than others.
I intend laying 600x300 porcelain tiles over this using granfix cfta slow set adhesive which ia good for a 3 to 6mm bed with up to 12mm in places. I fall within this spec but wonder if I would be better with a levelling compound before starting tiling or maybe skimming the hollows with adhesive first?
Running a level over the floor some joists are up to 7mm lower than others.
I intend laying 600x300 porcelain tiles over this using granfix cfta slow set adhesive which ia good for a 3 to 6mm bed with up to 12mm in places. I fall within this spec but wonder if I would be better with a levelling compound before starting tiling or maybe skimming the hollows with adhesive first?