dilz000
ok, so I've already done the work, but its for my girlfriends m&d so they never asked for a quote, it was a "just let us know what we owe you" situation, no problems I thought. Now due to waiting for them to do certain things I lost some time eg. waiting a morning for plywood, waiting for tiles, then just going to get them myself as it was easier. you all know the type of people, very nice, but nice and laid back. so in total Its taken 5 and a half days, but really 4 days worth of hours.
This is what I have had to do:
* To prepare area suitable for tiling, including:
- Removal of the shower glass, shower tray, toilet and sink/pedistal.
- Removal of existing tiled floor.
- Removal of existing damaged T&G floor.
- Bracing of existing joists
- To cut and fit 18mm W&B ply
- Over board with 6mm cement board.
* To tile:
- Appx. 2.6m2 of mosaics in a straight grid pattern and grout.
- Area behind shower tray and re-grout ready for instalation.
- Silicon around floor once shower tray has been installed.
Now before I tell them how much I want, how much would you sugest I charge, labour only?
Thanks guys
This is what I have had to do:
* To prepare area suitable for tiling, including:
- Removal of the shower glass, shower tray, toilet and sink/pedistal.
- Removal of existing tiled floor.
- Removal of existing damaged T&G floor.
- Bracing of existing joists
- To cut and fit 18mm W&B ply
- Over board with 6mm cement board.
* To tile:
- Appx. 2.6m2 of mosaics in a straight grid pattern and grout.
- Area behind shower tray and re-grout ready for instalation.
- Silicon around floor once shower tray has been installed.
Now before I tell them how much I want, how much would you sugest I charge, labour only?
Thanks guys