Ripping up a floor

To lift all tiles, in them different rooms,remove them all to a skip,lift all boards,(90m2 is nigh on 32 8x4 sheets)you would have to bar them up, take you weeks to uncover over 2000 screw heads 🙂 🙂 🙂 then remove to skip,me id put 4/5 days in for 1 man and his lab .
If someone can do all that in 2 days on his own i will buy him a pint and treat him to a high class hooker 🙂
 
Last week it took me nearly all day to remove a tiled floor in a 3m bathroom, 6mm ply screwed thousands of times and some form of glue as well. Should've been an hour's work tops

You can't really judge them until you get stuck in
 
so the best option is... walk in there with a crowbar, hammer and chisel and begin smashing your way through a 1m2 diameter and see how long it takes.... then do the quote ha
 
I have to quote for the worst case scenario so thinking around 10 days.
As Martyn above said it took him 1 day to lift 3m2 of 6mm ply this is 90m2 and a 12/15mm ply I also wonder about the possibility of the floor boards been pulled off the joists when levering up the floor.
Know idea how previously well it was put down.
 

Advertisement

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.2%
  • Kerakoll

    Votes: 17 9.9%
  • Ardex

    Votes: 12 7.0%
  • Mapei

    Votes: 49 28.5%
  • Ultra Tile

    Votes: 21 12.2%
  • BAL

    Votes: 40 23.3%
  • Wedi

    Votes: 4 2.3%
  • Benfer

    Votes: 5 2.9%
  • Tilemaster

    Votes: 24 14.0%
  • Weber

    Votes: 19 11.0%
  • Other (any other brand not listed)

    Votes: 17 9.9%
  • Nicobond

    Votes: 8 4.7%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 2.9%
Back
Top

Click Here to Register for Free / Remove Ad