I would be allowing for either a liquid dpm or an uncoupling membrane. The concrete this time of year will take flipping ages...... Minimum of 2months if not longer before you tile. For the sake of the cost in a room the size of a bathroom i would not be tking risks and would uncouple......
 
T

TheTiler

If it's concrete, it's 7 weeks, but depends on the thickness of the concrete and following temperature. In cold temps (below 5 deg C) you may have to extend the waiting time for up to 12 months. Always drill a pilot hole to determine dryness and use a moisture meter probe. It would be tiling suicide to tile on a green background as new concrete will shrink over time (especially when central heating is introduced into the room). This will result in the substrate shrinking and de-laminating from the the fixed ties, breaking the bond and resulting in complete tiling failure. It's reality.
 
16
138
London
Hi Guys, sorry to jump in your thread but my coservatory is going to be screeded on tuesday to a depth of 4inches, my plan was to leave it for one month, then prime twice, install 10mm insulation board on flexible adhesive, lay UFH wire, Latex then tile....... Does this sound like the best way to go to you pro's? someone suggested thati should lay ditra matting, the the thing is that i thought that insulation board would do a similar job to the ditra ie:acting as a slight deflecter. Or should i install both?

I will be tiling it with Travertine.

Thank you very much in advance
 
16
138
London
Ajax's your man for screed advise here.
Ditra mat doesn't effect the underfloor heating, so use it.
What your saying is the right way to lay your floor.

Wow that was quick, thanks Bugs.

Are you saying to use it as well as the insulation board or instead of the insulation board? If using it with the insulation board where would it's place be on the floor

Thanks mate
 
B

bugs183

I have no life but this forum Motorman!!
Yea sorry didn't make much sense that. Lay your screed, allow to dry. Fix the insulation board with a good quality flexible adhesive (i use a 10mm trowel to get there to be bed nicely). I'd leave that overnight to dry. Test the ufh and use an electronic alarm during the installation to check it doesn't get damaged.Lay out the underfloor heating. Take photos so you have an idea where the cables run.
Now i do the next part a bit differently than the others here, its a bit messy but i hate faffing with tape and glue guns and swearing at the wires that refuse to lay flat. I trowel rapid set adhesive with a 6mm notched trowel onto the insulation boards, roll the ufh into this and then lay fibreglass mesh over the top (this is used for reinforcing render and comes on a 50m roll and is 500mm wide), then i press this into the adhesive and trowel in down. Its a bit messy and sometimes awkward, but i never have any hassle with the cables afterwards!!!
Leave to dry or level straight on top.
Leave overnight, get your 5-6mm trowel and again with flexible adhesive trowel this onto the dry levelling compound ad roll the ditra onto this. Get piece of wood 3x2 is a good size and use it to press the ditra into the adhesive. Leave overnight.
Start tiling!
 
B

bugs183

Good question, there and one i can't answer 100% confidently.
It must have some give due to its make up, but no normal drying cracks should effect the underfloor heating, things would have to be pretty bad for that to happen.
The ditra can part within itself, yet remain the same shape, this is why it is such a good product.
Well if you spend all day tiling pretty much 7 days a week it does make good reading, and the guys here really know their stuff (i don't get involved in any football talk, not a fan at all!).
 
This thread hasn't been replied to for 14 days, so replying to this one may not get a response. Post a new thread instead.

Reply to screed drying time. in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

Hi guys, I've just installed Weberfloor flex in a small area 1m2 @35-40mm depth in one pour...
Replies
0
Views
801
Hi guys, I've had a bit of an issue on a job I've been doing recently. We finished tiling on...
Replies
8
Views
2K
Hi folks, We're having our downstairs tiles installed soon, about 82m2 of 1.2x1.2m square...
Replies
4
Views
2K
We are looking for flooring for our new kitchen, lounge and hallway and would like to use LVT...
Replies
7
Views
2K
ben_gee
B
    • Like
Hi everyone I am building my own house and now I'm ready to tile the floor downstairs. I have...
Replies
1
Views
891

Trending UK Tiling Threads

UK Tiling Forum Popular

Advertisement

Tilers Forums on FB

...

You're browsing the UK Tiling Forum category on TilersForums.com, the tile advice website no matter which country you reside. Our UK based online tiling forum has 48,000 members and started out in 2006.

Top