J
jaffa17
Hi all, newbie here, we are in the process of refitting our small bathroom and would really appreciate any advice you could give us:
1: We are still in the process of knocking off the old tiles in preparation for plastering, do I fit the low profile shower tray before or after plastering?
2: We have decided to lay 6mm Hardibacker board onto the timber floorboards. The instructions say the showertray should be laid on 18mm marine ply or concrete. Can I sit the tray onto the Hardibacker using mortar or do I have to use ply under the tray?
3: If I have to use marine plywood under the shower tray should I remove the floorbords and screw ply directly to Joists?
Sorry if these questions seem a bit of a no brainer but its better to ask than **** the whole job up.
Cheers, Andy
1: We are still in the process of knocking off the old tiles in preparation for plastering, do I fit the low profile shower tray before or after plastering?
2: We have decided to lay 6mm Hardibacker board onto the timber floorboards. The instructions say the showertray should be laid on 18mm marine ply or concrete. Can I sit the tray onto the Hardibacker using mortar or do I have to use ply under the tray?
3: If I have to use marine plywood under the shower tray should I remove the floorbords and screw ply directly to Joists?
Sorry if these questions seem a bit of a no brainer but its better to ask than **** the whole job up.
Cheers, Andy