Hi all
I'm just about to do a wetroom with a solid floor. The drain has been dug out by the plumber and made level with the floor. I've built up the floor around the shower floor with cement boards to bring up the hight so there's a fall to the drain. I have a few questions.
1. What is the best way to create the fall for the drain prior to tiling? should i use an slc but mixed very thick and just trowel it to a fall? (the tiles are mosaics)
2. Do i tank before or after creating the fall with slc?
3. The mosaics cover the floor in the rest of the room aswell, which would you tile first? The shower or the rest of the room?
Cheers for responses
I'm just about to do a wetroom with a solid floor. The drain has been dug out by the plumber and made level with the floor. I've built up the floor around the shower floor with cement boards to bring up the hight so there's a fall to the drain. I have a few questions.
1. What is the best way to create the fall for the drain prior to tiling? should i use an slc but mixed very thick and just trowel it to a fall? (the tiles are mosaics)
2. Do i tank before or after creating the fall with slc?
3. The mosaics cover the floor in the rest of the room aswell, which would you tile first? The shower or the rest of the room?
Cheers for responses