Currently on a job, 2 new builds & a donor house for a renovation.
In the 2 houses I've completed 4 Wetrooms , 3 bathrooms a kitchen & still to complete 150/160m2 of floor tiling.
I was meant to be doing 4 bathrooms in the renovation house but running out of time & the builder got in a local independent tile shop & tiler to complete the job.
Got a quick look at the standard of work today, shocking isn't the word, tiler isn't very quick either.
Setting out terrible, tiling terrible, prep terrible, the list goes on.
He's fixing 500x330 ceramics & this is what they are using,
Read the back of the tub & was shocked at what I saw.
Then spied this sitting,
This is the cut at the top of the widow for the header,
Time will tell if they get to finish the job.
In the 2 houses I've completed 4 Wetrooms , 3 bathrooms a kitchen & still to complete 150/160m2 of floor tiling.
I was meant to be doing 4 bathrooms in the renovation house but running out of time & the builder got in a local independent tile shop & tiler to complete the job.
Got a quick look at the standard of work today, shocking isn't the word, tiler isn't very quick either.
Setting out terrible, tiling terrible, prep terrible, the list goes on.
He's fixing 500x330 ceramics & this is what they are using,
Read the back of the tub & was shocked at what I saw.
Then spied this sitting,
This is the cut at the top of the widow for the header,
Time will tell if they get to finish the job.