hi there.
im doing a bathroom for a neighbour in the evenings and spare days. there is a new screed so i can tile the floor for another 4 -5 weeks (2 weeks down) as a result i cant fit the bottom row down on top of the floor .
there is a 1200 x 900 shower tray in the corner and a glass wall . the glass wall is in my garage on a big pallet and taking up the whole place. i need the garage to build a few cabinets next week. im sure she would like to get her shower working ( using ours).
could i grout just the shower area and leave the rest until the floor is done. or could i do everything now exept the bottom row obviously. will the colour match .
any advice
thank s alan
im doing a bathroom for a neighbour in the evenings and spare days. there is a new screed so i can tile the floor for another 4 -5 weeks (2 weeks down) as a result i cant fit the bottom row down on top of the floor .
there is a 1200 x 900 shower tray in the corner and a glass wall . the glass wall is in my garage on a big pallet and taking up the whole place. i need the garage to build a few cabinets next week. im sure she would like to get her shower working ( using ours).
could i grout just the shower area and leave the rest until the floor is done. or could i do everything now exept the bottom row obviously. will the colour match .
any advice
thank s alan