R
Raja
Today got a call from a builder from Nottingham wanted a full landing and stiarcase tiling with quarry tiles so thought yes will go on and have a look went to the address where a full renovation was taking place looked at the job and it was big old job would take around 3 to 4 days to do i think. around 30sq metres in total.
Some one was due to do the tiling in sheffield but let them down.I Wanted to ask if i needed to put any thing other than primer on the surface before laying the tiles currently just boarded out floors thanks in advance.
Since i posted my dipressing thread on work and life have taken on 2 jobs so am over the moon at the minute moral is high.
DAVE if you have a minute could let post a few tips ta me darling
Some one was due to do the tiling in sheffield but let them down.I Wanted to ask if i needed to put any thing other than primer on the surface before laying the tiles currently just boarded out floors thanks in advance.
Since i posted my dipressing thread on work and life have taken on 2 jobs so am over the moon at the minute moral is high.
DAVE if you have a minute could let post a few tips ta me darling