Still trying to find most cost effective way to to straighten out a concrete sub base in a church before laying French limestone.
need to make levels up between 0-20mm in places .
i could bed stone in mix of plastering sand white cement and adhesive but I can not give a guarantee with this method even though done many many times with old stone floors plus going on top of ditra which only made up to 10mm bed.
there will be a liquid resin Dpm going on top of concrete.
what does anyone think of a thin bonded screed before tiling and if so how thin can you go and do you know a specialist who would undertake this in ascot Surrey.
Area is 320 sq mts
need to make levels up between 0-20mm in places .
i could bed stone in mix of plastering sand white cement and adhesive but I can not give a guarantee with this method even though done many many times with old stone floors plus going on top of ditra which only made up to 10mm bed.
there will be a liquid resin Dpm going on top of concrete.
what does anyone think of a thin bonded screed before tiling and if so how thin can you go and do you know a specialist who would undertake this in ascot Surrey.
Area is 320 sq mts