Just nearing completion on construction of ground floor bathroom and en-suite, both will have wet room showers and I am starting from bare breeze blocks and screed floor so now is the point to get any prep done before tiling. My plan is to tank the wet room parts and use tile backer boards on any stud work (unless anyone tells me otherwise).
Rooms are going to be tiled with Travertine (I know original) and was wondering the best way to provide a substrate for these. Can I tile direct onto blocks? Screed will have wet UFH in it so is there any special prep needed there???
Looking forward to any advice and thanks in advance.
First post so go easy on me!
Just nearing completion on construction of ground floor bathroom and en-suite, both will have wet room showers and I am starting from bare breeze blocks and screed floor so now is the point to get any prep done before tiling. My plan is to tank the wet room parts and use tile backer boards on any stud work (unless anyone tells me otherwise).
Rooms are going to be tiled with Travertine (I know original) and was wondering the best way to provide a substrate for these. Can I tile direct onto blocks? Screed will have wet UFH in it so is there any special prep needed there???
Looking forward to any advice and thanks in advance.