S
sean2012
hey guys!
got a 70m2 travertine floor to start on monday, 30m2 is screed and 40m2 is beam n block i recommended DITRA over the lot and an expansion joint between the two, not sure just matting over would be enough to stop cracking.
thoughts and suggestion would be great please.
Sean.
got a 70m2 travertine floor to start on monday, 30m2 is screed and 40m2 is beam n block i recommended DITRA over the lot and an expansion joint between the two, not sure just matting over would be enough to stop cracking.
thoughts and suggestion would be great please.
Sean.