L
Laurie
I have a job tiling onto screed laid on underfloor heating. This was installed a number of months ago, and the heating unit has not been run since (house is a new build which has been sitting empty through the winter). The moisture level in the screed seems too high to tile successfully onto, and having looked into it a little bit, I think I need to advise that they have the heating fully connected, and run for a while to dry out the screed before I start tiling. What does anyone else think ?
Thanks !!
Thanks !!