V
vanessagernat
Hi
We carried out a renovation on a period house 4 years ago. There was a prime contractor supervised by our architect. A travertine floor was laid over chipboard flooring beneath which there is underfloor heating. About eighteen months after moving in a few hairline cracks appeared. Our builders chopped out some of the cracked travertine and replaced. We now wonder whether they used the right underlay or right adhesve as there are now cracks approximately every 24 inches which are getting worse. Any thoughts as to what we can do and who is responsible, supplier, archtiect or builder?
We carried out a renovation on a period house 4 years ago. There was a prime contractor supervised by our architect. A travertine floor was laid over chipboard flooring beneath which there is underfloor heating. About eighteen months after moving in a few hairline cracks appeared. Our builders chopped out some of the cracked travertine and replaced. We now wonder whether they used the right underlay or right adhesve as there are now cracks approximately every 24 inches which are getting worse. Any thoughts as to what we can do and who is responsible, supplier, archtiect or builder?