T
Time's Ran Out
Got to the job 8-30am this morning (it was just up the road) and the customer wanted the basin and wc. in slightly different positions to where the Bathroom Co I'am working for had put them.
Just mixed up a tub of fast set white (big tiles) when a plumber turns up at 12-00 to move the basin!
So I'am home for lunch with a tub of fast set to fix the uncoupling membrane on the kitchen floor that is waiting to be done. Trouble is the wife is not around so I've got to go and buy a toastie from around the shops and when she comes back she'll wonder how the matting got put down!:smilewinkgrin: Might be in her good books for a change.
Just mixed up a tub of fast set white (big tiles) when a plumber turns up at 12-00 to move the basin!
So I'am home for lunch with a tub of fast set to fix the uncoupling membrane on the kitchen floor that is waiting to be done. Trouble is the wife is not around so I've got to go and buy a toastie from around the shops and when she comes back she'll wonder how the matting got put down!:smilewinkgrin: Might be in her good books for a change.