L
lady
Hi!
This is a great forum, have been reading this a while. Could someone point me to right direction - I am putting down UFH in kitchen, small loo and utility room app. 15m2 altogether. Have removed the horrible plastic tiles and ALL of the HORRIBLE black stuff and now have just the concrete base but this is not even. The differences are max 3mm. Now the question: Do I need to prime or screed the floor before putting to UFH mat and self levelling compound? If yes, could I use the self levelling compound which I have extra or do I need to buy yet another product :smilewinkgrin: ?
This is a great forum, have been reading this a while. Could someone point me to right direction - I am putting down UFH in kitchen, small loo and utility room app. 15m2 altogether. Have removed the horrible plastic tiles and ALL of the HORRIBLE black stuff and now have just the concrete base but this is not even. The differences are max 3mm. Now the question: Do I need to prime or screed the floor before putting to UFH mat and self levelling compound? If yes, could I use the self levelling compound which I have extra or do I need to buy yet another product :smilewinkgrin: ?