Hi everyone,
I'm just looking for some advice regarding preparing a floor with piped ufh.
It's a full ground floor. Approximately 100m2 split between seven rooms including the hallway. 1000x215 porcelain throughout. Piped ufh system. I've been advised it'll be screeded with Mapei Topchem.
I recommended installing an uncoupling membrane (probably durabase) before fixing tiles. However, the customer is asking if we could go straight on to the screed.
Would it be safe to tile straight on to this? The largest room is approximately 7x5m. Any advice would be much appreciated. Thanks.
I'm just looking for some advice regarding preparing a floor with piped ufh.
It's a full ground floor. Approximately 100m2 split between seven rooms including the hallway. 1000x215 porcelain throughout. Piped ufh system. I've been advised it'll be screeded with Mapei Topchem.
I recommended installing an uncoupling membrane (probably durabase) before fixing tiles. However, the customer is asking if we could go straight on to the screed.
Would it be safe to tile straight on to this? The largest room is approximately 7x5m. Any advice would be much appreciated. Thanks.