Hello, my first post proper. I have a large extension to tile. The floorscreed has been poured over the wet underfloor heating loops, and has set nicely. My problem is that the finished screed level is just under 40mm lower than it should have been. I now have a choice of either somehow adding to the screed level, or lowering the adjacent timber floors, so avaoinding any excessive steps. The screed as poured is about 65mm thick at the moment. Is there a recognised way or raising the screed level without risking cracking and affecting the efficiency of the underfloor heating? Or is lowering the timber a better suggestion. Tiles will be 10mm porcelain, already bought and paid for, so I can't use a thicker alternative. Any advice would be welcome.
Thanks, DH