R
rcjtiling
i have a job to do tomorrow on a bathroom floor , its had 12mm ply screwed down and primed , sorted but it not that level and up and down in parts , the builder who im doing the job for wants it proper level but it means packing it out up to 2inch as it hits the centre point of the room , i did say to the builder it wants sorting proplerly but he is having none of it , is packing it out that much to much ? as i normaly do all the prep myself and never have this problem , tiles are 600 by 300 porcelin , cheers